Obtain Environmental Compliance |
B: 165. Revise/Update Environmental Compliance Documentation for all applicable work on Coho Reintroduction and UCSCSA final site list compliance for acclimation |
|
01/31/2022 |
01/31/2022 |
Effective implementation management and timely contract administration |
C: 119. Manage and Administer 2021-2022 Project for Mid Columbia Coho Restoration & Upper Columbia Spring Chinook and Steelhead |
|
01/31/2022 |
01/31/2022 |
Completed Annual Report |
D: 132. Begin preparation for annual reporting of the CY21 period (2/1/21 through 1/31/22) |
|
01/31/2022 |
01/31/2022 |
Stakeholder Coordination |
E: 191. Coordination of Plan with Regional Stakeholders |
|
01/31/2022 |
01/31/2022 |
If needed, Update UCSCSA plan as needed for new sites towards implementation. |
F: 174. Update Upper Columbia Spring Chinook & Steelhead Acclimation (UCSCSA) Plan as sites become identified as part of the implementation schedule |
|
01/31/2022 |
01/31/2022 |
Continue to develop operation plans and protocols |
G: 174. Hatchery Operations and Facility Plans |
|
01/31/2022 |
01/31/2022 |
Conduct and document maintenance, repair and dredging activities |
H: 61. O&M for maintenance of facilities |
|
01/31/2022 |
01/31/2022 |
Acclimated smolts released |
I: 176. Acclimation/Release Coho BY2019: Wenatchee: Beaver Creek pond |
|
06/30/2021 |
06/07/2021 |
Acclimated smolts release |
J: 176. Acclimation/Release Coho BY2019: Wenatchee: Rohlfing's pond |
|
06/30/2021 |
05/26/2021 |
Acclimated smolts released |
K: 176. Acclimation/Release Coho BY2019: Wenatchee: Butcher pond |
|
06/30/2021 |
06/03/2021 |
Acclimated smolts released |
L: 176. Acclimation/Release Coho BY2019: Wenatchee: Coulter pond |
|
06/30/2021 |
06/04/2021 |
Acclimated smolts releases |
M: 176. Acclimation/Release Coho BY2019: Wenatchee: Leavenworth NFH |
|
04/25/2021 |
04/23/2021 |
Acclimated smolts released |
N: 176. Acclimation/Release Coho BY2019: Methow: Eightmile Ranch |
|
06/15/2021 |
05/26/2021 |
Acclimated smolts released |
O: 176. Acclimation/Release Coho BY2019: Methow: Lower Twisp Ponds |
|
05/15/2021 |
05/24/2021 |
Acclimated smolts released |
P: 176. Acclimation/Release Coho BY2019: Methow: Early Winters |
|
06/01/2021 |
05/28/2021 |
Acclimated smolts released |
Q: 176. Acclimation/Release Coho BY2019: Methow: Mid Valley Ponds |
|
06/01/2021 |
05/21/2021 |
Acclimated smolts released |
R: 176. Acclimation/Release Coho BY2019: Methow: Chewuch Acclimation Facility |
|
05/05/2021 |
04/30/2021 |
Acclimated smolts released |
S: 176. Acclimation/Release Coho BY2019: Methow: Twisp Weir |
|
05/01/2021 |
05/05/2021 |
Acclimate spring Chinook spring 2021. |
T: 176. Acclimate spring Chinook at Goat Wall Pond |
|
05/30/2021 |
05/03/2021 |
Collection of 2021 Coho Broodstock: Wenatchee and Methow programs |
U: 66. Trap 2021 broodstock at Dryden, Tumwater, Wells, Methow FH, Winthrop NFH, and Leavenworth NFH |
|
12/15/2021 |
12/15/2021 |
Spawn 2021 brood coho at Leavenworth NFH |
V: 176. Spawn 2021 brood coho at Leavenworth NFH |
|
12/25/2021 |
12/08/2021 |
Spawn 2021 coho broodstock at Winthrop NFH |
W: 176. Spawn 2021 brood coho at Winthrop NFH |
|
12/30/2021 |
12/06/2021 |
Carcass distribution for BY2021 broodstocks |
X: 44. Carcass dispersal of a portion of 2021 broodstock in the Wenatchee and Methow River programs |
|
01/31/2022 |
01/31/2022 |
Transport 2021 BY eyed coho eggs to rearing facilities |
Y: 66. Transport 2021 brood year eyed-eggs from incubation facilities to rearing facilities |
|
01/31/2022 |
01/31/2022 |
CWT or PBT mark fish BY 2020 |
Z: 158. Mark/Tag Animals - Subcontract CWT and/or PBT of approximately 2,000,000 BY20 coho pre-smolts |
|
11/30/2021 |
10/29/2021 |
PIT tag fish 2020 BY |
AA: 158. Mark/Tag Animals - PIT-tag up to 63,000 BY20 coho pre-smolts |
|
01/31/2022 |
01/31/2022 |
PIT tag spring Chinook |
AB: 158. PIT tag up to 12,000 BY20 Spring Chinook in the Methow basin for 2022 releases |
|
11/30/2021 |
11/17/2021 |
Coho redd counts and spawning composition for the 2021 return year |
AC: 157. Conduct spawning ground surveys for the 2021 return year in the Wenatchee Basin |
|
01/31/2022 |
01/31/2022 |
2021 return year coho redd counts and spawning composition |
AD: 157. Conduct spawning ground surveys for the 2021 return year in the Methow Basin |
|
01/31/2022 |
01/31/2022 |
Completed database |
AE: 157. Collect biological data from 2021 coho brood at spawning |
|
01/31/2022 |
01/31/2022 |
CWT recovery data from the 2021 BY |
AF: 157. Extract CWT from 2021 brood coho snouts collected at spawning and on spawning ground surveys |
|
01/31/2022 |
01/31/2022 |
Analyze data from 2021 |
AG: 162. Analyze and interpret M&E data from 2021 |
|
01/31/2022 |
01/31/2022 |
Enter data |
AH: 160. Enter data into and maintain local databases |
|
01/31/2022 |
01/31/2022 |
Collect data during 2021 emergence |
AI: 157. Collect/Generate Field and Lab Data to determine 2021 emergence timing, growth and distribution |
|
01/31/2022 |
01/31/2022 |
Tissue analysis by CRITFC for genetic monitoring |
AJ: 157. Analyze genetic tissue samples for PBT analysis of parental groups |
|
01/31/2022 |
01/31/2022 |
Completion of Trinity as an over-winter/acclimation site in the Chiwawa basin |
AK: 115. Develop additional site in the Wenatchee for spring Chinook & coho-Trinity |
|
06/01/2021 |
06/01/2021 |
Vegetation and Monitoring at project acclimation sites |
AL: 47. Vegetation Planting and Monitoring |
|
12/31/2021 |
12/08/2021 |